Commissioner for Transportation, Dr Frederic Oladeinde, disclosed this in a statement on Sunday in Lagos.
The re-opening will allow the resumption of movement arrangements of 12.00 a.m. for Lagos Island bound motorists and 12.00 noon for Mainland bound motorist subsist.
The bridge was totally shut on 28 January to enable completion of repair works on the double sized expansion.
It was to be reopened on 2 February.
However, the casting was accomplished much faster, by Saturday.
source https://www.ladunliadinews.com/2021/02/lagos-third-mainland-bridge-reopens.html
Copy the link below and Share with your Friends:
No comments:
Post a Comment